ok
Built Environment News

Oxford 'urgently requires construction of new homes'

0.0 / 4 September /
Oxford 'urgently requires construction of new homes'

Oxford is a city that urgently needs construction firms to be given the green light to carry out a plethora of new home building projects, such is its poor supply of residential properties at the moment.

Seven new schemes are set to be given the go-ahead and these will see about 90 new homes built in the near future, but that is only a fraction of the 2,000 properties Oxford City Council believes it needs to build each year for the next eight years in order to keep up with demand.

The Oxford Mail has quoted council leader Bob Price as saying that "nowhere near" enough affordable properties are currently being built in and around the city. As such, the authority's social housing waiting list has some 4,799 families on it.

Mr Price said: "These are really small sites that we are trying to make better use of. But they don't address the problem of affordable housing both to rent or to buy and in the longer term there can only be one solution which is to have one significant site to develop."

The local council has planned to spend about £60 million on the creation of up to 1,000 new homes in a bid to tackle the issue. But it will still need to do plenty more to satisfy demand and ensure everyone in the city has somewhere to live.

It is also overseeing the redevelopment of Bradlands in Old Marston, which previously contained some 30 flats. However, these buildings that were constructed in the 1960s are now being replaced with 48 new apartments, which is a small step in the right direction towards upping supply.

With plenty of house building projects either on the horizon or sure to be needed in the years to come, Oxford is a place where construction jobs may well be relatively easy to come by.

At the moment, the city council has about 7,800 social houses under its control, but it will need to increase this number significantly in the years to come.

Share with Twitter   Share with Google+   Share with Facebook   Share with Linkedin

Comments (0)

  • No comments

Most Read

  • New Barhale / Doosan JV secures double award

    / 2 August /
    The joint venture, which brings together two of the UK’s leading water sector specialist contractors, will undertake infrastructure and non-infrastructure capital projects through the framework including, in the case of Lot 2, civils-led and, under Lot 3, MEICA-led work. Severn Trent, which
  • nmcn secures AMP7 framework with South Staffs Water

    / 23 August /
    Extensive rebuilding and refurbishment work will be undertaken in 2020 to 2025 and beyond at Seedy Mill water treatment works, near Lichfield, and Hampton Loade water treatment works, near Bridgnorth. This work forms part of a longer-term strategy to develop the sites over the next 10 years to
  • WHO urges further research on microplastics in drinking water

    / 23 August /
    According to the analysis, which summarises the latest knowledge on microplastics in drinking water, microplastics larger than 150 micrometres are not likely to be absorbed in the human body and uptake of smaller particles is expected to be limited.  Absorption and distribution of very small

Add comment to Oxford 'urgently requires construction of new homes'

Name
Email
Comment text