ok
Built Environment News

Overdue £750M consultancy framework details released

0.0 / 7 November /
Overdue £750M consultancy framework details released

The framework covers work for a wide range of pubic sector bodies including all government spending departments, local authorities and police and fire services.  Contracts will be for an initial two years with a year by year extension possible for another two years and will cover a wide range of consultancy services including architecture and engineering, project management and cost consultancy.

 

The previous framework expired in June and during the delay the value of the new framework has risen from £600M. Initial bids must be submitted by 29 November and selected firms will be invited to tender on 6 January, with contract awards in March and the framework starting in April.

 

Government says procurement will allow smaller and medium sized consultants to compete either in joint venture or on their own. Up to 31 consultants could win places on the framework which is divided into five lots.

 

The framework is known as

 

Lot 1 will include eight firms capable of providing a ‘One stop shop’ across all services.

Lot 2 is for Project Management and five firms are expected to be allocated this work.

Lot 3 is for Cost Management, CDM and Health and Safety and five firms are to be selected.

Lot 4 will also include five firms for Design Team services

Lot 5 is for “One stop shop” international works on the overseas estate, including embassies, to which eight firms will be appointed.

Share with Twitter   Share with Google+   Share with Facebook   Share with Linkedin

Comments (0)

  • No comments

Most Read

  • New Barhale / Doosan JV secures double award

    / 2 August /
    The joint venture, which brings together two of the UK’s leading water sector specialist contractors, will undertake infrastructure and non-infrastructure capital projects through the framework including, in the case of Lot 2, civils-led and, under Lot 3, MEICA-led work. Severn Trent, which
  • nmcn secures AMP7 framework with South Staffs Water

    / 23 August /
    Extensive rebuilding and refurbishment work will be undertaken in 2020 to 2025 and beyond at Seedy Mill water treatment works, near Lichfield, and Hampton Loade water treatment works, near Bridgnorth. This work forms part of a longer-term strategy to develop the sites over the next 10 years to
  • WHO urges further research on microplastics in drinking water

    / 23 August /
    According to the analysis, which summarises the latest knowledge on microplastics in drinking water, microplastics larger than 150 micrometres are not likely to be absorbed in the human body and uptake of smaller particles is expected to be limited.  Absorption and distribution of very small

Add comment to Overdue £750M consultancy framework details released

Name
Email
Comment text