ok
Civil & Structural News

Airport plans expansion

0.0 / 20 September /
Airport plans expansion

London City Airport has submitted a planning application for a £200 million expansion that will create 500 construction jobs as well as 1,500 permanent jobs locally.

 

Airport owners Global Infrastructure Partners, also owners of Gatwick and Edinburgh airports, submitted their application on Thursday to Newham Borough Council. Passenger numbers are expected to double to six million with 120,000 flight movements over the next ten years – which permission was granted for in 2009 - if the expansion goes ahead.

 

The construction plan does not involve a new runway or any runway extension, but includes a terminal extension, additional and enlarged parking stands to the east of the existing airport buildings to accommodate larger aircraft, a new taxi lane to allow more efficient runway optimisation at busy periods.

 

The airport says it has also made submissions to the Airports Commission, or Davies Commission, which was set up in 2012 to make recommendations to the government on airport capacity in the south east of England. Chairman Howard Davies has promised a shortlist of ‘credible’ options for expanding capacity by December.

 

Eleven airlines already use the airport, serving 48 destinations. Airport Chief Executive Officer Declan Collier says the expansion is vital for the on-going development of the Royal Docks and the east of London. He said: ‘Increasingly this area is a focus for foreign investment. The recent announcement by ABP of its intention to build a multi million pound business park in Royal Albert Dock is one such example, and the connectivity to business centres across Europe, Eastern Europe and the Middle East that the airport provides, or will provide in the future, is central to this continuing.’

 

Share with Twitter   Share with Google+   Share with Facebook   Share with Linkedin

Comments (0)

  • No comments

Most Read

  • New Barhale / Doosan JV secures double award

    / 2 August /
    The joint venture, which brings together two of the UK’s leading water sector specialist contractors, will undertake infrastructure and non-infrastructure capital projects through the framework including, in the case of Lot 2, civils-led and, under Lot 3, MEICA-led work. Severn Trent, which
  • nmcn secures AMP7 framework with South Staffs Water

    / 23 August /
    Extensive rebuilding and refurbishment work will be undertaken in 2020 to 2025 and beyond at Seedy Mill water treatment works, near Lichfield, and Hampton Loade water treatment works, near Bridgnorth. This work forms part of a longer-term strategy to develop the sites over the next 10 years to
  • WHO urges further research on microplastics in drinking water

    / 23 August /
    According to the analysis, which summarises the latest knowledge on microplastics in drinking water, microplastics larger than 150 micrometres are not likely to be absorbed in the human body and uptake of smaller particles is expected to be limited.  Absorption and distribution of very small

Add comment to Airport plans expansion

Name
Email
Comment text